Strenght of any electric power system lies on its extent of development and capacity of generating plants, which are primarily expected to produce sufficient volume of electricity. Generation chain of the electric power system of Montenegro comprises HPP "Perućica" with seven small scale hydropower plants, HPP "Piva" and TPP "Pljevlja".
HPP "Perućica" is the oldest big hydropower plant in Montenegro, which started operation in 1960. It has 307 MW installed capacity, with possible annual generation of roughly 1,300 GWh. HPP "Piva", storage plant of a close to dam type, with one of the biggest concrete arch dams in the world, started operation in 1976, it has 342 MW installed capacity with planned annual electricity generation of 860 GWh. TPP "Pljevlja" began its operation in 1982, and it is the first Montenegrin condensation thermal power plant designed with two units of 210 MW, with only one unit built.

 

PLANT TYPE YEAR OF CONSTRUCTION INSTALLED CAPACITY [MVA] PLANNED ANNUAL GENERATION [GWh]
Perućica HPP 1960 330.00 957
Piva HPP 1976 360.00 762
Pljevlja TPP 1982 247.00 1200
Podgor small HPP 1939 0.46  
Rijeka Crnojevića small HPP 1948 0.65  
Rijeka Mušovića small HPP 1950 1.95  
Slap Zete small HPP 1952 2.40  
Glava Zete small HPP 1954 6.40  
Šavnik small HPP 1957 0.20  
Lijeva Rijeka small HPP 1987 0.11  
TOTAL (hydropower plants) 690.00 1719
TOTAL (thermal power plants) 247.00 1200
TOTAL (small scale hydropower plants) 12.17 21
TOTAL (in the system) 949.17 2940